This week has been a bit of a dead loss, I managed to get the pouch that I am doing for Piers finished, but failed to get it in the post.
To make matters worse, the house that I rent has no cavity wall insulation and suffers with damp (we only recently go loft insulation done as the rather pathetic 50mm at best was knackered). This has meant that we have got the people to come and do the cavities this coming week.
The major issue is of course that my workshop is attached to the end of the house and due to the fact that they need to drill holes every meter or so on that wall I have had to dismantle my workshop and remove the roof.
I know it has to be done, but it’s a real pain. The other problem will be fitting the roof again afterwards, as you just never know what we’re gonna get as far as the weather is concerned.
I had some good news about embossing plates so any leather work that is done in the future will probably now have a Green-Craft logo embossed into it post their arrival.
Beyond that, there’s not been a lot going on.